🏭🗒️Microsoft Fabric: Power BI Environments [Notes]

Disclaimer: This is work in progress intended to consolidate information from various sources for learning purposes. For the latest information please consult the documentation (see the links below)! 

Last updated: 26-Apr-2025

Enterprise Content Publishing [2]

[Microsoft Fabric] Power BI Environments

  • {def} structured spaces within Microsoft Fabric that helps organizations manage the Power BI assets through the entire lifecycle
  • {environment} development 
    • allows to develop the solution
    • accessible only to the development team 
      • via Contributor access
    • {recommendation} use Power BI Desktop as local development environment
      • {benefit} allows to try, explore, and review updates to reports and datasets
        • once the work is done, upload the new version to the development stage
      • {benefit} enables collaborating and changing dashboards
      • {benefit} avoids duplication 
        • making online changes, downloading the .pbix file, and then uploading it again, creates reports and datasets duplication
    • {recommendation} use version control to keep the .pbix files up to date
      • [OneDrive] use Power BI's autosync
        • {alternative} SharePoint Online with folder synchronization
        • {alternative} GitHub and/or VSTS with local repository & folder synchronization
    • [enterprise scale deployments] 
      • {recommendation} separate dataset from reports and dashboards’ development
        • use the deployment pipelines selective deploy option [22]
        • create separate .pbix files for datasets and reports [22]
          • create a dataset .pbix file and uploaded it to the development stage (see shared datasets [22]
          • create .pbix only for the report, and connect it to the published dataset using a live connection [22]
        • {benefit} allows different creators to separately work on modeling and visualizations, and deploy them to production independently
      • {recommendation} separate data model from report and dashboard development
        • allows using advanced capabilities 
          • e.g. source control, merging diff changes, automated processes
        • separate the development from test data sources [1]
          • the development database should be relatively small [1]
    • {recommendation} use only a subset of the data [1]
      • ⇐ otherwise the data volume can slow down the development [1]
  • {environment} user acceptance testing (UAT)
    • test environment that within the deployment lifecycle sits between development and production
      • it's not necessary for all Power BI solutions [3]
      • allows to test the solution before deploying it into production
        • all tests must have 
          • View access for testing
          • Contributor access for report authoring
      • involves business users who are SMEs
        • provide approval that the content 
          • is accurate
          • meets requirements
          • can be deployed for wider consumption
    • {recommendation} check report’s load and the interactions to find out if changes impact performance [1]
    • {recommendation} monitor the load on the capacity to catch extreme loads before they reach production [1]
    • {recommendation} test data refresh in the Power BI service regularly during development [20]
  • {environment} production
    • {concept} staged deployment
      • {goal} help minimize risk, user disruption, or address other concerns [3]
        • the deployment involves a smaller group of pilot users who provide feedback [3]
    • {recommendation} set production deployment rules for data sources and parameters defined in the dataset [1]
      • allows ensuring the data in production is always connected and available to users [1]
    • {recommendation} don’t upload a new .pbix version directly to the production stage
      •  ⇐ without going through testing
  • {feature|preview} deployment pipelines 
    • enable creators to develop and test content in the service before it reaches the users [5]
  • {recommendation} build separate databases for development and testing 
    • helps protect production data [1]
  • {recommendation} make sure that the test and production environment have similar characteristics [1]
    • e.g. data volume, sage volume, similar capacity 
    • {warning} testing into production can make production unstable [1]
    • {recommendation} use Azure A capacities [22]
  • {recommendation} for formal projects, consider creating an environment for each phase
  • {recommendation} enable users to connect to published datasets to create their own reports
  • {recommendation} use parameters to store connection details 
    • e.g. instance names, database names
    • ⇐  deployment pipelines allow configuring parameter rules to set specific values for the development, test, and production stages
      • alternatively data source rules can be used to specify a connection string for a given dataset
        • {restriction} in deployment pipelines, this isn't supported for all data sources
  • {recommendation} keep the data in blob storage under the 50k blobs and 5GB data in total to prevent timeouts [29]
  • {recommendation} provide data to self-service authors from a centralized data warehouse [20]
    • allows to minimize the amount of work that self-service authors need to take on [20]
  • {recommendation} minimize the use of Excel, csv, and text files as sources when practical [20]
  • {recommendation} store source files in a central location accessible by all coauthors of the Power BI solution [20]
  • {recommendation} be aware of API connectivity issues and limits [20]
  • {recommendation} know how to support SaaS solutions from AppSource and expect further data integration requests [20]
  • {recommendation} minimize the query load on source systems [20]
    • use incremental refresh in Power BI for the dataset(s)
    • use a Power BI dataflow that extracts the data from the source on a schedule
    • reduce the dataset size by only extracting the needed amount of data 
  • {recommendation} expect data refresh operations to take some time [20]
  • {recommendation} use relational database sources when practical [20]
  • {recommendation} make the data easily accessible [20]
  • [knowledge area] knowledge transfer
    • {recommendation} maintain a list of best practices and review it regularly [24]
    • {recommendation} develop a training plan for the various types of users [24]
      • usability training for read only report/app users [24
      • self-service reporting for report authors & data analysts [24]
      • more elaborated training for advanced analysts & developers [24]
  • [knowledge area] lifecycle management
    • consists of the processes and practices used to handle content from its creation to its eventual retirement [6]
    • {recommendation} postfix files with 3-part version number in Development stage [24]
      • remove the version number when publishing files in UAT and production 
    • {recommendation} backup files for archive 
    • {recommendation} track version history 

    References:
    [1] Microsoft Learn (2021) Fabric: Deployment pipelines best practices [link]
    [2] Microsoft Learn (2024) Power BI: Power BI usage scenarios: Enterprise content publishing [link]
    [3] Microsoft Learn (2024) Deploy to Power BI [link]
    [4] Microsoft Learn (2024) Power BI implementation planning: Content lifecycle management [link]
    [5] Microsoft Learn (2024) Introduction to deployment pipelines [link]
    [6] Microsoft Learn (2024) Power BI implementation planning: Content lifecycle management [link]
    [20] Microsoft (2020) Planning a Power BI  Enterprise Deployment [White paper] [link]
    [22] Power BI Docs (2021) Create Power BI Embedded capacity in the Azure portal [link]
    [24] Paul Turley (2019)  A Best Practice Guide and Checklist for Power BI Projects

    Resources:

    Acronyms:
    API - Application Programming Interface
    CLM - Content Lifecycle Management
    COE - Center of Excellence
    SaaS - Software-as-a-Service
    SME - Subject Matter Expert
    UAT - User Acceptance Testing
    VSTS - Visual Studio Team System
    SME - Subject Matter Experts

    No comments:

    Related Posts Plugin for WordPress, Blogger...

    About Me

    My photo
    Koeln, NRW, Germany
    IT Professional with more than 25 years experience in IT in the area of full life-cycle of Web/Desktop/Database Applications Development, Software Engineering, Consultancy, Data Management, Data Quality, Data Migrations, Reporting, ERP implementations & support, Team/Project/IT Management, etc.