🧭Business Intelligence: Why Data Projects Fail to Deliver Real-Life Impact (Part I: First Thoughts)

Business Intelligence
Business Intelligence Series

A data project has a set of assumptions and requirements that must be met, otherwise the project has a high chance of failing. It starts with a clear idea of the goals and objectives, and they need to be achievable and feasible, with the involvement of key stakeholders and the executive without which it’s impossible to change the organization’s data culture. Ideally, there should also be a business strategy, respectively a data strategy available to understand the driving forces and the broader requirements. 

An organization’s readiness is important not only in what concerns the data but also the things revolving around the data - processes, systems, decision-making, requirements management, project management, etc. One of the challenges is that the systems and processes available can’t be used as they are for answering important business questions, and many of such questions are quite basic, though unavailability or poor quality of data makes this challenging if not impossible. 

Thus, when starting a data project an organization must be ready to change some of its processes to address a project’s needs, and thus the project can become more expensive as changes need to be made to the systems. For many organizations the best time to have done this was when they implemented the system, respectively the integration(s) between systems. Any changes made after that come in theory with higher costs derived from systems and processes’ redesign.

Many projects start big and data projects are no exception to this. Some of them build a costly infrastructure without first analyzing the feasibility of the investment, or at least whether the data can form a basis for answering the targeted questions. On one side one can torture any dataset and some knowledge will be obtained from it (aka data will confess), though few datasets can produce valuable insights, and this is where probably many data projects oversell their potential. Conversely, some initiatives are worth pursuing even only for the sake of the exposure and experience the employees get. However, trying to build something big only through the perspective of one project can easily become a disaster. 

When building a data infrastructure, the project needs to be an initiative given the transformative potential such an endeavor can have for the organization, and the different aspects must be managed accordingly. It starts with the management of stakeholders’ expectations, with building a data strategy, respectively with addressing the opportunities and risks associated with the broader context.

Organizations recognize that they aren’t capable of planning and executing such a project or initiative, and they search for a partner to lead the way. Becoming overnight such a partner is more than a challenge as a good understanding of the industry and the business is needed. Some service providers have such knowledge, at least in theory, though the leap from knowledge to results can prove to be a challenge even for experienced service providers. 

Many projects follow the pattern: the service provider comes, analyzes the requirements, builds something wonderful, the solution is used for some time and then the business realizes that the result is not what was intended. The causes are multiple and usually form a complex network of causality, though probably the most important aspect is that customers don’t have the in-house technical resources to evaluate the feasibility of requirements, solutions, respectively of the results. Even if organizations involve the best key users, are needed also good data professionals or similar resources who can become the bond between the business and the services provider. Without such an intermediary the disconnect between the business and the service provider can grow with all the implications. 

Previous Post <<||>> Next Post

21 March 2021

𖣯Strategic Management: The Impact of New Technologies (Part III: Checking the Vital Signs)

Strategic Management

An organization which went through a major change, like the replacement of a strategic system (e.g. ERP/BI implementations), needs to go through a period of attentive supervision to address the inherent issues that ideally need to be handled as they arise, to minimize their future effects. Some organizations might even go through a convalescence period, which risks to prolong itself if the appropriate remedies aren’t found. Therefore, one needs an entity, who/which has the skills to recognize the symptoms, understand what’s happening and why, respectively of identifying the appropriate actions.

Given technologies’ multi-layered complexity and the volume of knowledge for understanding them, the role of the doctor can be seldom taken by one person. Moreover, the patient is an organization, each person in the organization having usually local knowledge about the patient. The needed knowledge is dispersed trough the organization, and one needs to tap into that knowledge, identify the people close to technologies and business area, respectively allow such people exchange information on a regular basis.

The people who should know the best the organization are in theory the management, however they are usually too far away from technologies and often too busy with management topics. IT professionals are close to technologies, though sometimes too far away from the patient. The users have a too narrow overview, while from logistical and economic reasons the number of people involved should be kept to a minimum. A compromise is to designate one person from each business area who works with any of the strategic systems, and assure that they have the technical and business knowledge required. It’s nothing but the key-user concept, though for it to work the key-users need not only knowledge but also the empowerment to act when the symptoms appear.

Big organizations have also a product owner for each application who supervises the application through its entire lifecycle, and who needs to coordinate with the IT, business and service providers. This is probably a good idea in order to assure that the ROI is reached over time, respectively that the needs of the system are considered within the IT operation context. In small organizations, the role can be taken by a technical or a business resource with deeper skills then the average user, usually a key-user. However, unless joined with the key-user role, the product owner’s focus will be the product and seldom the business themes.

The issues that need to be overcome after major changes are usually cross-functional, being imperative for people to work together and find solutions. Unfortunately, it’s also in human nature to wait until the issues are big enough to get the proper attention. Unless the key-users have the time allocated already for such topics, the issues will be lost in the heap of operational and tactical activities. This time must be allocated for all key-users and the technical resources needed to support them.

Some organizations build temporary working parties (groups of experts working together to achieve specific goals) or similar groups. However, the statute of such group needs to be permanent if the organization wants to continuously have its health in check, to build the needed expertize and awareness about occurred or potential issues. Centers of excellence/expertize (CoE) or competency centers (CC) are such working groups with permanent statute, having defined roles, responsibilities, and processes for supporting and promoting the effective use of technologies within the organization, respectively of monitoring and systematically addressing the risks and opportunities associated with them.

There’s also the null hypothesis, doing nothing, relying solely on employees’ professionalism, though without defined responsibility, accountability and empowerment, it can get messy.

Previous Post <<||>> Next Post

𖣯Strategic Management: The Impact of New Technologies (Part II - The Technology-oriented Patient)

Strategic Management

Looking at the way data, information and knowledge flow through an organization, with a little imagination one can see the resemblance between an organization and the human body, in which the networks created by the respective flows spread through organization as nervous, circulatory or lymphatic braids do, each with its own role in the good functioning of the organization. Each technology adopted by an organization taps into these flows creating a structure that can be compared with the nerve plexus, as the various flows intersect in such points creating an agglomeration of nerves and braids.

The size of each plexus can be considered as proportional to the importance of the technology in respect to the overall structure. Strategic technologies like ERP, BI or planning systems, given their importance (gravity), resemble with the organs from the human body, with complex networks of braids in their vicinity. Maybe the metaphor is too far-off, though it allows stressing the importance of each technology in respect to its role and the good functioning of the organization. Moreover, each such structure functions as pressure points that can in extremis block any of the flows considered, a long-term block having important effects.

The human organism is a marvelous piece of work reflecting the grand design, however in time, especially when neglected or driven by external agents, diseases can clutch around any of the parts of the human body, with all the consequences deriving from this. On the other side, an organization is a hand-made structure found in continuous expansion as new technologies or resources are added. Even if the technologies are at peripheral side of the system, their good or bad functioning can have a ripple effect trough the various networks.

Replacing any of the above-mentioned strategic systems can be compared with the replacement of an organ in the human body, having a high degree of failure compared with other operations, being complex in nature, the organism needing long periods to recover, while in extreme situations the convalescence prolongs till the end. Fortunately, organizations seem to be more resilient to such operations, though that’s not necessarily a rule. Sometimes all it takes is just a small mistake for making the operation fail.

The general feeling is that ERP and BI implementations are taken too lightly by management, employees and implementers. During the replacement operation one must make sure not only that the organ fits and functions as expected, but also that the vital networks regained their vitality and function as expected, and the latter is a process that spans over the years to come. One needs to check the important (health) signs regularly and take the appropriate countermeasures. There must be an entity having the role of the doctor, who/which has the skills to address adequately the issues.

Moreover, when the physical structure of an organization is affected, a series of micro-operations might be needed to address the deformities. Unfortunately, these areas are seldom seen in time, and can require a sustained effort for fixing, while a total reconstruction might apply. One works also with an amorphous and ever-changing structure that require many attempts until a remedy is found, if a remedy is possible after all.

Even if such operations are pretty well documented, often what organizations lack are the skilled resources needed during and post-implementation, resources that must know as well the patient, and ideally its historical and further health preconditions. Each patient is different and quite often needs its own treatment/medication. With such changes, the organization lands itself on a discovery journey in which the appropriate path can easily deviate from the well-trodden paths.

Previous Post <<||>> Next Post

07 March 2021

💼Project Management: Methodologies (Part II: Agile Manifesto Reloaded II - Requirements Management)

Project Management

Independently of its scope and the methodology used, each software development project is made of the same blocks/phases arranged eventually differently. It starts with Requirements Managements (RM) subprocesses in which the functional and non-functional requirements are gathered, consolidated, prioritized and brought to a form which facilitates their understanding and estimation. It’s an iterative process as there can be overlapping in functionality, requirements that don’t bring any significant benefit when compared with the investment, respectively new aspects are discovered during the internal discussions or with the implementer.

As output of this phase, it’s important having a list of requirements that reflect customer’s needs in respect to the product(s) to be implemented. Once frozen, the list defines project’s scope and is used for estimating the costs, sketching a draft of the final solution, respectively of reaching a contractual agreement with the implementer. Ideally the set of requirements should be completed and be coherent while reflecting customer’s needs. It allows thus in theory to agree upon costs as well about an architecture and other important aspects (responsibilities/accountability).

Typically, each new requirement considered after this stage needs to go through a Change Management (CM) process in which it gets formulated to the needed level of detail, a cost, effort and impact analysis is performed, respectively the budget for it is approved or the change gets rejected. Ideally small changes can be considered as part of a buffer budget upfront, however in the end each change comes with a cost and project delays.

Some changes can come late in the project and can have an important impact on the whole architecture when important aspects were missed upfront. Moreover, when the number of changes goes beyond a certain limit it can lead to what is known as scope creep, with important consequences on project’s costs, timeline and quality. Therefore, to minimize the impact on the project, the number of changes needs to be kept to a minimum, typically considering only the critical changes, while the others can be still implemented after project’s end.

The agile manifesto’s principles impose an important constraint on the requirements - changing requirements is a good practice even late in the process – an assumption - best requirements emerge from self-organizing teams, and probably one implication – the requirements need to be defined together with the implementer.

The way changing requirements are handled seem to provide more flexibility though it’s actually a constraint imposed on the CM process which interfaces with the RM processes. Without a proper CM in place, any requirement might arrive to be implemented, independently on whether is feasible or not. This can easily make project’s costs explode, sometimes unnecessarily, while accommodating extreme behavior like changing the same functionality frequently, handling exceptions extensively, etc.

It’s usually helpful to define the requirements together with the implementer, as this can bring more quality in the process, even if more time needs to be invested. However, starting from a solid set of requirements is a critical factor for project’s success. The manifesto makes no direct statement about this. Just iterates that good requirements emerge from self-organizing teams which is not necessarily the case. 

The users who in theory can define the requirements best are the ones who have the deepest knowledge about an organization’s processes and IT architecture, typically the key users and/or IT experts. Self-organization revolves around how a team organizes itself and handles the various activities, though there’s no guarantee that it will address the important aspects, no matter how motivated the team is, how constant the pace, how excellent the technical details were handled or how good the final product works.

Previous Post <<||>>Next Post

04 March 2021

💼Project Management: Project Execution (Part III: Projects' Dynamics - An Introduction)

Despite the considerable collection of books on Project Management (PM) and related methodologies, and the fact that projects are inherent endeavors in professional as well personal life (setups that would give in theory people the environment and exposure to different project types), people’s understanding on what it takes to plan and execute a project seems to be narrow and questionable sometimes. Moreover, their understanding diverges considerably from common sense. It’s also true that knowledge and common sense are relative when considering any human endeavor in which there are multiple roads to the same destination, or when learning requires time, effort, skills, and implies certain prerequisites, however the lack of such knowledge can hurt when endeavor’s success is a must and a team effort. 

Even if the lack of understanding about PM can be considered as minor when compared with other challenges/problems faced by a project, when one’s running fast to finish a race, even a small pebble in one’s running shoes can hurt a lot, especially when one doesn’t have the luxury to stop and remove the stone, as it would make sense to do.

It resides in the human nature to resist change, to seek for information that only confirm own opinions, to follow the same approach in handling challenges, even if the attempts are far from optimal, even if people who walked the same path tell you that there’s a better way and even sketch the path and provide information about what it takes to reach there. As it seems, there’s the predisposition to learn on the hard way, if there’s significant learning involved at all. Unfortunately, such situations occur in projects and the solutions often overrun the boundaries of PM, where social and communication skills must be brought into play. 

On the other side, there’s still hope that change can be managed optimally once the facts are explained to a certain level that facilitates understanding. However, such an attempt can prove to be quite a challenge, given the various setups in which PM takes place. The intersection between technologies and organizational setups lead to complex scenarios which make such work more difficult, even if projects’ challenges are of organizational rather than technological nature. 

When the knowledge we have about the world doesn’t fit our expectation, a simple heuristic is to return to the basics. A solid edifice can be built only on a solid foundation and the best foundation in coping with reality is to establish common ground with other people. One can achieve this by identifying their suppositions and expectations, by closing the gap in perception and understanding, by establishing a basis for communication, in which feedback is a must if one wants to make significant progress.

Despite of being explorative and time-consuming, establishing common ground can be challenging when addressing to an imaginary audience, which is quite often the situation. The practice shows however that progress can be made by starting with a set of well-formulated definitions, simple models, principles, and heuristics that have the potential of helping in sense-making.

The goal is thus to identify first the definitions that reflect the basic concepts that need to be considered. Once the concepts defined, they can be related to each other with the help of a few models. Even if fictitious, as simplifications of the reality, the models should allow playing with the concepts, facilitating concepts’ understanding. Principles (set of rules for reasoning) can be used together with heuristics (rules of thumb methods or techniques) for explaining the ‘known’ and approaching the ‘unknown’. Even maybe not perfect, these tools can help building theories or explanatory constructs.

||>>Next Post

09 January 2021

🧮ERP: Implementations (Part V: It’s all about Partnership - An Introduction)

ERP Implementation
ERP Implementations Series

Unless the organization (customer) implementing an ERP system has a strong IT team and the knowledge required for the implementation is available already in-house, the resources need to be acquired from the market, and probably the right thing to do is to identify a certified implementer (partner) which can fill the knowledge and skillset gaps, respectively which can help splitting the risks associated with such an implementation.

In theory, the customer provides knowledge about its processes, while the partner comes with expertise about the system to be implemented and further technologies, industry best practices, project methodologies, etc. Further on, the mix is leveraged to harness the knowledge and reach project’s objectives. 

In praxis however finding an implementer which can act as partner might be more challenging than expected. This because the implementer needs to understand customer’s business and where it’s heading, bridge the gap between functional requirements and system’s functionality, advise on areas of improvement, prepare the customer for the project and lead the customer through the changes, respectively establish a basis for the future. Some of the implications are seldom made explicit even if they are implied by what is needed by the project. 

Technology is seldom the issue in an ERP implementation, the challenges residing in handing the change and the logistics required. There are so many aspects to be considered and handled, and this can be challenging for any implementer no matter how long has been on the market or how experienced the resources are. Somebody needs to lead the change and the customer seldom has the knowledge to handle the change. In some cases, the implementer must make the customer aware of the implications, while in others needs to take the initiative and lead the change, though the customer needs to play along, which can be challenging also. 

Many aspects need to be handled at management level from a strategical point of view on customer’s side. It starts with assuring that the most important aspects of the business where considered, that the goals and objectives are clear, that the proper environment is created, and ends with the timely decision-making, with assuring that the resources are available when needed, that the needed organization structures and roles are in place, that the required knowledge is available before, during and after implementation, that the potential brought by the ERP system is harnessed for the years to come. 

A partnership allows in theory splitting the implementation risks as ERP implementations have a high rate of failure. Quite often the outcomes of such projects don’t meet the expectations, the systems being in extremis unusable or a bottleneck for the organization. Ideally one should work with the partner(s) and attempt solving the issues, split eventually the incurred cost overruns, find a middle way. Most of the times it’s recommended to find a solution together rather than coming to a litigation. 

Given the complex dependencies existing between the various parts of the project, the causes that lead to poor implementations are difficult to prove, as there are almost always grey areas. Moreover, the litigations can require a considerable time and resources to settle. These can be just extreme situations, and as long one has a good partner, there’s no need to think that far. On the other side, even if undesirable, one must be prepared also for such outcomes, even if the countermeasures may involve an additional effort. Therefore, one must address such issues in contracts by establishing the areas of accountability/responsibilities for each party, document adequately the requirements and further (important) communication, make sure that the deliverables have the expected quality, etc.

Previous Post <<||>> Next Post

05 January 2021

🧮ERP: Implementations (Part III: It’s all about Scope I - Functional Requirements)

ERP Implementation
ERP Implementations Series


Introduction

ERP (Enterprise Resource Planning) Implementations tend to be expensive projects, often the actual costs overrunning the expectations by an important factor. The causes for this are multiple, the most important ones ranging from the completeness and complexity of the requirements and the impact they have on the organization to the availability of internal and external skilled resources, project methodology, project implementation, organization’s maturity in running projects, etc. 

The most important decision in an ERP implementation is deciding what one needs, respectively what will be considered for the implementation, aspects reflected in a set of functional and nonfunctional requirements. 

Functional Requirements 

The functional requirements (FRs) reflect the expected behavior of the system in respect to the inputs and outputs – what the system must do. Typically, they encompass end-users’ requirements in the area of processes, interfaces and data processing, though are not limited to them. 

The FRs are important because they reflect the future behavior of the system as perceived by the business, serving further as basis for identifying project’s scope, the gaps between end-users’ requirements and system’s functionality, respectively for estimating project’s duration and areas of focus. Further they are used as basis for validating system’s behavior and getting the sign-off for the system. Therefore, the FRs need to have the adequate level of detail, be complete, clear, comprehensible and implementable, otherwise any gaps in requirements can impact the project in adverse ways. To achieve this state of art they need to go through several iterations in which the requirements are reevaluated, enhanced, checked for duplication, relevance or any other important aspect. In the process it makes sense to categorize the requirements and provide further metadata needed for their appraisal (e.g. process, procedure, owner, status, priority). 

Once brought close to a final form, the FRs are checked against the functionality available in the targeted system, or systems when more systems are considered for evaluation. Ideally all the requirements can be implemented with the proper parametrization of the systems, though it’s seldom the case as each business has certain specifics. The gaps need to be understood, their impact evaluated and decided whether the gaps need to be implemented. In general, it’s recommended to remain close to the standard functionality, as each further gap requires further changes to the system, gaps that in time can generate further quality-related and maintenance costs. 

It can become a tedious effort, as in the process an impact and cost-benefit analysis need to be performed for each gap. Therefore, gaps’ estimation needs to occur earlier or intermixed with their justification. Once the list of the FRs is finalized and frozen, they will be used for estimating the final costs of the project, identifying the work packages, respectively planning the further work.  Once the FRs frozen, any new requirements or changes to requirements (including taking out a requirement) need to go through the Change Management process and all the consequences deriving from it – additional effort, costs, delays, etc. This can trigger again an impact and cost-benefit analysis. 

The FRs are documented in a specification document (aka functional requirement specification), which is supposed to track all the FRs through their lifetime. When evaluating the FRs against system’s functionality it’s recommended to provide general information on how they will be implemented, respectively which system function(s) will be used for that purpose. Besides the fact that it provides transparence, the information can be used as basic ground for further discussions. 

Seldom all the FRs will be defined upfront or complete. Moreover, some requirements will become obsolete during project’s execution, or gaps will be downgraded as standard and vice-versa. Therefore, it’s important to recollect the unexpected.

Previous Post  <<||>> Next Post

14 October 2020

𖣯🧮Strategic Management: Simplicity VI (ERP Implementations' Story II)


Besides the witty sayings and theories advanced in defining what simplicity is about, life shows that there’s a considerable gap between theory and praxis. In the attempt at a definition, one is forced to pull more concepts like harmony, robustness, variety, balance, economy, or proportion, which can be grouped under organic unity or similar concepts. However, intuitionally one can advance the idea that from a cybernetic perspective simplicity is achieved when the information flows are not disrupted and don’t meet unnecessary resistance. By information here are considered the various data aggregations – data, information, knowledge, and eventually wisdom (aka DIKW pyramid) – though it can be extended to encompass materials, cash and vital energy.

One can go further and say that an organization is healthy when the various flows mentioned above run smoothly through the organization nourishing it. The comparison with the human body can go further and say that a blockage in the flow can cause minor headaches or states that can take a period of convalescence to recover from them. Moreover, the sustained effort applied by an organization can result in fatigue or more complex ailments or even diseases if the state is prolonged. 

For example, big projects like ERP implementations tend to suck the vital energy of an organization to the degree that it will take months to recover from the effort, while the changes in the other types of flow can lead to disruptions, especially when the change is not properly managed. Even if ERP implementations provide standard solutions for the value-added processes, they represent vendors’ perspective into the respective processes, which don’t necessarily fit an organization’s needs. One is forced then to make compromises either by keeping close to the standard or by expanding the standard processes to close the gap. Either way processual changes are implied, which affect the information flow, especially for the steps where further coordination is needed, respectively the data flow in respect to implementation or integration with the further systems. A new integration as well as a missing integration have the potential of disrupting the data and information flows.

The processual changes can imply changes in the material flow as the handling of the materials can change, however the most important impact is caused maybe by the processual bottlenecks, which can cause serious disruptions (e.g. late deliveries, production is stopped), and upon case also in the cash-flow (e.g. penalties for late deliveries, higher inventory costs). The two flows can be impacted by the data and information flows independently of the processual changes (e.g. when they have poor quality, when not available, respectively when don’t reach the consumer in timely manner). 

With a new ERP solution, the organization needs to integrate the new data sources into the existing BI infrastructure, or when not possible, to design and implement a new one by taking advantage of the technological advancements. Failing to exploit this potential will impact the other flows, however the major disruptions appear when the needed knowledge about business processes is not available in-house, in explicit and/or implicit form, before, during and after the implementation. 

Independently on how they are organized – in center of excellence or ad-hoc form – is needed a group of people who can manage the various flows and ideally, they should have the appropriate level of empowerment. Typically, the responsibility resides with key users, IT and one or two people from the management. Without a form of ‘organization’ to manage the flows, the organization will reside only on individual effort, which seldom helps reaching the potential. Independently of the number of resources involved, simplicity is achieved when the activities flow naturally. 

Previous Post <<||>> Next Post

Written: Sep-2020, Last Reviewed: Mar-2024

28 July 2019

🧱IT: Change Management [CM] (Definitions)

"The disciplined use of a defined process to control project modifications, additions, and deletions." (Timothy J  Kloppenborg et al, "Project Leadership", 2003)

"The process allowing changes to applications to occur in a predictable fashion with minimal or no impact on the service. Change management applies to all phases of a lifecycle." (Allan Hirt et al, "Microsoft SQL Server 2000 High Availability", 2004)

"Process of enabling change in an organization as a result of a system implementation." (Janice M Roehl-Anderson, "IT Best Practices for Financial Managers", 2010)

"(1) A structured approach to transitioning individuals, teams, and organizations from a current state to a desired future state. (2) Controlled way to effect a change, or a proposed change, to a product or service." (Requirements Engineering Qualifications Board, "Standard glossary of terms used in Requirements Engineering", 2011)

"A structured approach to transition individuals, teams, and organizations from a current state to a desired future state, which includes managing change as part of systems development to avoid user resistance to business and system changes." (Linda Volonino & Efraim Turban, "Information Technology for Management" 8th Ed, 2011)

"Involves problem solving in a concerted effort to adapt to changing organizational needs." (Joan C Dessinger, "Fundamentals of Performance Improvement" 3rd Ed, 2012)

"The process of communicating and managing change throughout the organization." (Charles Cooper & Ann Rockley, "Managing Enterprise Content: A Unified Content Strategy, 2nd Ed.", 2012)

"The management of change in operational processes and applications. Change management is critical when IT organizations are managing software infrastructure in conjunction with new development processes. All software elements have to be synchronized so that they work as intended." (Marcia Kaufman et al, "Big Data For Dummies", 2013)

"A program designed to prevent unintended outages from changes. Personnel submit change requests, and appropriate experts review them to identify unintended consequences. Personnel do not make changes until the change goes through the change management process." (Darril Gibson, "Effective Help Desk Specialist Skills", 2014)

"The organization's effort to control and manage the introduction of new changes to the current operating model to ensure gradual and successful adoption." (Jim Davis & Aiman Zeid, "Business Transformation: A Roadmap for Maximizing Organizational Insights", 2014)

"Methods and best practices to assist an organization and its employees in implementing changes to business processes, culture, and systems." (Robert F Smallwood, "Information Governance: Concepts, Strategies, and Best Practices", 2014)

"The process, tools, and techniques to manage the people side of change to achieve a required business outcome." (Jonathan Ferrar et al, "The Power of People: Learn How Successful Organizations Use Workforce Analytics To Improve Business Performance", 2017)

"A business process aimed at deliberately regulating the changing nature of business activities such as projects." (Shon Harris & Fernando Maymi, "CISSP All-in-One Exam Guide, 8th Ed", 2018)

"Process responsible for controlling the lifecycle of all changes" (ITIL)

 "The process, tools, coordination, and planning to manage the people side of change through sentiment awareness and change-management skills that together achieve a required state of business agility." (Forrester)

06 June 2019

ITIL: Change Request (Definitions)

"Any request submitted by a customer (buyer or users) for a change to alter the system. These appear in various forms and include software trouble reports (STRs) and baseline change requests (BCRs). BCRs request changes to the system’s specification." (Richard D Stutzke, "Estimating Software-Intensive Systems: Projects, Products, and Processes", 2005)

"Requests to expand or reduce the project scope, modify policies, processes, plans, or procedures, modify costs or budgets, or revise schedules." (Project Management Institute, "Practice Standard for Project Estimating", 2010)

"A document requesting a change for a project." (Bonnie Biafore, "Successful Project Management: Applying Best Practices and Real-World Techniques with Microsoft® Project", 2011)

"An official document requesting modification of existing features, requirements or functions or new ones. Change Request should contain description of the current solution, justification for a change and suggested (desired) solution." (IQBBA, "Standard glossary of terms used in Software Engineering", 2011)

"An appeal to the change review board for a modification to the project by any stakeholder. The request typically includes the justification, relationship of the change to the project goal and objectives, description of the change and deliverables, and effect on project risk." (Bonnie Biafore & Teresa Stover, "Your Project Management Coach: Best Practices for Managing Projects in the Real World", 2012)

"Change management notification for change in current process/environment." (Bill Holtsnider & Brian D Jaffe, "IT Manager's Handbook" 3rd Ed, 2012)

"A formal proposal to modify any document, deliverable, or baseline." (For Dummies, "PMP Certification All-in-One For Dummies" 2nd Ed., 2013)

"1. Written request or proposal to perform a specific change for a development product or to allow it to be implemented. 2. A request to change some software artifact due to a change in requirements." (Tilo Linz et al, "Software Testing Foundations" 4th Ed, 2014)

"Change management notification for a change in current process/environment." (Bill Holtsnider & Brian D Jaffe, "IT Manager's Handbook" 3rd Ed", 2012)

07 May 2019

𖣯Strategic Management: Strategic Perspectives (Part I: Agile vs. Lean Organizations)

Strategic Management

Agile and lean are two important concepts that pervaded the organizations in the past 20-30 years, though they continue to have little effect on organizations’ operations.

Agile is rooted in the need to respond promptly to the changing needs of an organization. The agile philosophy was primarily groomed in Software Development to reconcile the changing customer requirements with disciplined project execution, however it can be applied to an organization’s processes as well. An agile process is in general a process designed to deliver the intended results in an effective and efficient manner by addressing promptly the changing requirements in customers’ needs.

Lean is a systematic method for the minimization of waste, rooted as philosophy in manufacturing. The lean mindset attempts removing the non-value-added activities from processes because they bring no value for the customers. Thus a lean process is a process designed to deliver the intended results in an effective and efficient manner by focusing on the immediate needs of the customers, what customers want and value (when they want it). 

Effective means being successful in producing a desired or intended result, while efficient means achieving maximum productivity with minimum wasted effort or expense. The requirement for a process to be effective and efficient is translated in delivering what’s intended by using a minimum of steps designed in such a way that the quality of the end results is not affected, at least not for the essential characteristics. Efficiency is translated also in the fact that the information, material and resources’ flow suffer minimal delays.

Agile focuses in answering promptly the changing requirements in customers’ needs, while lean focuses on what customers wants and value while eliminating waste. Both mindsets seem to imply iterative and adaptive approaches in which the improvement happens gradually. Through their nature the two mindsets seem to complete each other. Some even equate agile with lean however an agile process is not necessarily lean and vice-versa.

To improve the effectiveness and efficiency of its operations an organization should aim developing processes that are agile and lean to optimize the information and material flows, while focusing on its users’ changing needs, and while eliminating continuously the activities that lead to waste. And waste can take so many forms – the unnecessary bureaucracy reflected in multiple and repetitive sign-offs and approvals, the lack of empowerment, not knowing what to do, etc.

There’s important time wasted just because the users don’t know or don’t understand an organization’s processes. If an organization can’t find rules that everyone understands then a process is doomed, independently of the key area the process belongs to. There’s also the tendency of attempting to address each exception within a process to the degree that multiple processes result. There’s no perfect process, however one can define the basic flow and document the main exceptions, while providing users some guidelines in navigating the unknown and unpredictable.

As part of same tendency it makes sense to move requests that respect a standard procedure on the list of standard requests instead of following futile steps just for the sake of it. It’s the case of requests that can be fulfilled with internal resources, e.g. the development of reports or extraction of data, provisioning of SharePoint websites, some performance optimizations, etc. In addition, one can unify processes that seem to be disconnected, e.g. the handling of changes as part of the Change Management respectively Project Management as they involve almost the same steps.

Probably it's in each organization’s interest to discover and explore the benefits of applying the agile and lean mindsets to its operation and integrate them in its culture

Previous Post <<||>> Next Post

💼Project Management: Methodologies (Part III: Agility under Eyeglasses I)

Mismanagement

There are more and more posts in the cyberspace voicing against the agile practices, the way they are understood and implemented by organizations. Some try to be hilarious [5]; others try to keep the scholastic seriousness [1] [2] [3] [4], and all of them make some valid points. In each remark there’re some seeds of truth, even if context-dependent.

Personally, I embrace an agile approach when possible, however I find it difficult to choose between the agile methodologies available on the market because each of them introduces some concepts that contradict what it means to be agile – to respond promptly to business needs. It doesn’t mean that one must consider each requirement, but that’s appropriate to consider those which have business justification. Moreover, organizations need to adapt the methodologies to their needs, and seldom vice-versa.
Considering the Agile Manifesto, it’s difficult to take as serious statements that lack precision, formulations like “we value something over something else” are more of a wish than principles. When people don’t understand what the agile “principles” mean, one occasionally hears statements like “we need no documentation”, “we need no project plan”, “the project plan is not important”, “Change Management doesn’t apply to agile projects” or “we need only high-level requirements because we’ll figure out where we’re going on the way”. Because of the lack of precision, a mocker can variate the lesser concept to null and keep the validity of the agile “principles”.
The agile approaches seem to lack control. If you’re letting the users in charge of the scope then you risk having a product that offers a lot though misses the essential, and thus unusable or usable to a lower degree. Agile works good for prototyping something to show to the users or when the products are small enough to easily fit within an iteration, or when the vendor wants to gain a customer’s trust. Therefore, agile works good with BI projects that combine in general all three aspects.
An abomination is the work in fix sprints or iterations of one or a few weeks, and then chopping the functionality to fit the respective time intervals. If you have the luck of having sign-offs and other activities that steal your time, then the productive time reduces up to 50% (the smaller the iterations the higher the percentage). What’s even unconceivable is that people ignore the time spent with bureaucracy. If this way of working repeats in each iteration then the project duration multiplies by a factor between 2 or 4, the time spent on Project Management increasing by the same factor. What’s not understandable is that despite bureaucracy the adherence to delivery dates, budget and quality is still required.
Sometimes one has the feeling that people think that software development and other IT projects work like building a house or like the manufacturing of a mug. You choose the colors, the materials, the dimensions and voila the product is ready. IT projects involve lot of unforeseen and one must react agilely to it. Here resides one of the most important challenges.   
Communication is one important challenge in a project especially when multiple interests are involved. Face-to-face conversation is one of the nice-to-have items on the wish list however in praxis isn’t always possible. One can’t expect that all the resources are available to meet and decide. In addition, one needs to document everything from meeting minutes, to Business Cases and requirements. A certain flexibility in changing the requirements is needed though one can’t change them arbitrarily, there must be a concept behind otherwise the volume of overwork can easily make the budget for a project explode exponentially.
||>> Next Post (continuation) 
Resources:
[1] Harvard Business Review (2018) Why Agile Goes Awry - and How to Fix It, by Lindsay McGregor & Neel Doshi (Online) Available from: https://hbr.org/2018/10/why-agile-goes-awry-and-how-to-fix-it
[2] Forbes (2012) The Case Against Agile: Ten Perennial Management Objections, by Steve Denning  (Online) Available from:
https://www.forbes.com/sites/stevedenning/2012/04/17/the-case-against-agile-ten-perennial-management-objections/#6df0e6ea3a95 
[3] Springer (2018) Do Agile Methods Work for Large Software Projects?, by Magne Jørgensen  (Online) Available from:
https://link.springer.com/chapter/10.1007/978-3-319-91602-6_12
[4] Michael O Church (2015) Why “Agile” and especially Scrum are terrible  (Online) Available from:
https://michaelochurch.wordpress.com/2015/06/06/why-agile-and-especially-scrum-are-terrible/
[5] Dev.to (2019) Mockery of agile, by Artur Martsinkovskyi (Online) Available from: https://dev.to/arturmartsinkovskyi/mockery-of-agile-5bdf

12 March 2019

🧭Business Intelligence: Enterprise Reporting (Part XII: Reports’ Lifecycle)

Business Intelligence

Introduction

A report’s lifecycle is the sequence of stages through which a report goes during the timespan of its ownership. The main stages resume mainly to report’s definition, development, testing and deployment, however a report’s life occurs within the context of IT processes like Change, Incident/Problem, Access, Availability, Information Security and Knowledge Management. To them can add up Data Management processes like Data Governance, Data Quality and Metadata Management. Therefore, the extended reports’ lifecycle could take the following form:


The processes can be easily tailored to an organization’s needs, even if it may take several attempts until the best mix is found. The activities introduced by the supporting processes don’t necessarily change the way reports are developed as long the processes integrate smoothing in report’s authoring.

Definition Phase

The lifecycle of a report starts with a series of steps that lead to report’s definition and the requirements associated with it:



The starting point is the identification of a need for data. It can be a business question that needs to be answered, a decision that needs to be made, data needed to keep an operational, tactical or strategical objective under control, and so on. Such business situations can be referred simple as (business) problems.
Problem definition
Problem definition (statement) is the process by which a business issue or need is clearly and concisely stated. This step might seem trivial and implied, however in praxis correlated to it lies the most important volume of overwork.

The dictum “a problem well stated is a problem half-solved” applies as well in BI field. Unfortunately, there are cases in which the users want something else than stated or they leave important details out. Sometimes the users aren’t sure what they need/want, and it comes in developer’s attributions to help clarify the problem and put it within a context.

There are cases in which the users just request a report without specifying the problem they need to solve. This might do when the user has a good understanding of the data and the problem, however this approach does not always work. Personally, I find it useful to define for each report also the underneath problem. I see it as a “win-win” situation in which the user invests some knowledge into the developer and thus the developer will better understand the business, while in time he can provide better help. A thorough understanding of the business and knowledge of the users and their needs can help minimize the volume of overwork involved in reports’ development.
Requirements definition
Requirements definition is the process by which functional and non-functional expectations, targets and specifications are elicited and documented.

Functional requirements specify what the report must do - how the report is structured or formatted, how data need to be visualized or navigated, to what file formats need to be exported, on whether needs to be printed, how the data needs to be grouped, in which order, in what currency/language needs to be displayed, what data sources need to be used, etc. The functional requirements are typically listed in the use case and test script.

Non-functional requirements refer to requirements related to report’s accessibility, availability, performance, compliance, documentation, quality, maintainability, security or testability.

The degree to which a requirement can be fulfilled depends entirely on the reporting platform. It can be differentiated between soft and hard constraints. Soft constraints can be overcome by adding more processing power, memory or other types of resources, while hard constraints can’t be easily or at all overcome. Of course, not all requirements are equally important. Important not fulfilled requirements can make a report unusable and, in extremis, can lead to choosing one reporting platform over another.

The requirements can be elicited by a developer, an analyst/consultant or defined by the business itself. Organizations can simplify the process by defining a set of guidelines and standards that need to be considered in reports’ definition. Normally, is enough to reference the document(s) where the guidelines and standards are found. In contrast to other software artifacts, the requirements for reports can be gather in a simplified version of a document. Quite often a checklist can help identify these requirements upfront with a minimum of overhead.
Report definition
Report definition is the process by which report’s content, logic and layout are explicitly defined - what attributes are needed for output and from what source, what static/dynamic parameters are needed, how the data need to be displayed/formatted, what formulas, aggregations or ordering apply.

A report’s definition can be anything between a simple statement summarizing what the report is about and complex structures (mainly in form of a mapping) reflecting in detail each attribute, constraint, formula, grouping or sorting.

A good definition should allow a developer to create the report as needed by the users, eventually with minimal deviations implied by user’s understanding. The holy grail in report’s definition is finding a structure flexible enough to cover all the aspects of a report. Even if some structures allow such flexibility, sometimes it’s almost impossible not provide additional descriptions in textual forms. The less insight the developer has into the business, the more textual descriptions and visuals are needed to be included to support the knowledge gap.
GAP Analysis
GAP Analysis is the iterative process by which the current state of a software artifact or situation is compared with the potential or desired state. It became an integrant tool from professionals’ thinking to the extent its role as separate process is quite often ignored. In the context of reporting authoring it can be used when comparing the requirements against the current infrastructure and the data available, as well while comparing the developed report against the requirements.

It can happen that the technical and data constraints don’t allow building the report as needed by the users. The differences need to be mitigated and eventually the requirements need to be changed to accommodate the reality. In extremis must be considered whether the report still make sense in the light of the modified requirements.
Solution formulation
Solution formulation is the process by which a formal (technical) solution is defined for the given requirements. It’s a conceptualization (aka concept) of the requirements, and in many cases it’s just a short description by which means the report will be build and what data sources will be used. In more complex cases it can include details about the changes needed in the infrastructure to support the report (e.g. creation/extensions of tables and other database objects, ETL jobs, components, etc.), about the data that need to be collected, etc.

Of course, the conceptualization must be considered together with report’s definition. In fact, report’s definition can be considered as part of the conceptualization. A conceptualization can cover multiple reports, as well two or more different solutions can be provided for different sets of reports. The infrastructure can make a concept futile, either when there is a single reporting platform, or when clear rules are in place.
Prototyping
Prototyping is the iterative process of building a simplified version of the report for demonstration and evaluation purposes, so that users can better define the requirements or to prove the concept. The prototype is a preliminary version that can be refined successively until user’s requirements have a final form. It can take the form of a mock-up query to verify report’s technical and logical feasibility, and/or an Excel layout to depict how the report will look like. Prototypes can facilitate the communication between the parties involved and can be considered as part of the requirements.

A prototype might be needed 1 from 5 cases or so, however this number depends also on the number of queries available or of the knowledge of the source and business processes. Because a prototype can involve additional work, it’s important to identify those cases in which a prototype makes sense and keep the effort to a minimum, especially when an approval is involved in the process. Therefore, one should consider the most important characteristics that need to be proved (e.g. if the data can be aggregated, matched, displayed at the requested level of detail, or in the requested format).

With the help of self-service tools, the business has the capabilities to play with the data and find answers by itself, being able thus to create a prototyped version of the report. Once the report met business needs it can be standardized so it can be used organization-wide. It’s recommended to standardize the reports that are used as part of organization’s processes, otherwise self-service can become a bottleneck for the organization.
Change Management
Change Management is the process of ensuring that the changes performed to a system, in this case a BI tool or the whole BI infrastructure, are performed with minimal disruption for the business and that risks are kept under control. Changes can be requested via standard requests or change requests. A standard request (SR) is a pre-approved change that involves low risks, is relatively common and follows a predefined procedure. In contrast to SRs, a change request (CR) requires the authorization of a board, e.g. the Change Advisory Board (CAB), it often involves risks, an investment and the approach is not that common.

Both are hard-copy or electronic templates that allow to capture information about the changes and allow to document the change and track its status. They include typically the problem definition together with users’ requirements, report definition and the formulation of the solution. What differentiates them thus is the approval process that can be sometimes time-consuming, and the volume of formalism needed to manage the requests (e.g. tracking status, writing status reports, handling risks, etc.).

Unless infrastructural changes are necessary, the risks involved with the creation of reports are relatively small, especially when the reports are developed in-house. Reports developed by vendors involve more risks and imply investments that in a form or other need to be approved. Considering the particularities of the two approaches, personally I think that reports that can be developed with internal resources should be done via SRs, while reports developed externally should be done via CRs. Even if this categorization has the potential of creating some confusion, the use of SRs allows reducing the volume of effort necessary to manage the requests. I suppose there can be found solutions to request external changes via SRs as well (e.g. by using contingents and a set of well-defined rules).

18 December 2016

♟️Strategic Management: Organizations (Just the Quotes)

"The whole object of the organization is to get cooperation, to get to each individual the benefit of all the knowledge and all the experience of all individuals." (Hamilton M Barksdale, 1909)

"The only way for a large organization to function is to decentralize, to delegate real authority and responsibility to the man on the job. But be certain you have the right man on the job." (Robert E Wood, 1951)

"Organization planning is the process of defining and grouping the activities of the enterprise so that they may be most logically assigned and effectively executed. It is concerned with the establishment of relationships among the units so as to further the objectives of the enterprise." (Ernest Dale, "Planning and developing the company organization structure", 1952)

"Many individuals and organization units contribute to every large decision, and the very problem of centralization and decentralization is a problem of arranging the complex system into an effective scheme." (Herbert A. Simon, "Administrative Behavior", 1957) 

"The leadership and other processes of the organization must be such as to ensure a maximum probability that in all interactions and all interactions and all relationships with the organization each member will, in the light of his background, values, and expectations, view the experience as supportive and one which builds and maintains his sense of personal worth and importance." (Rensis Likert, "New patterns of management", 1961)

"The concept of leadership has an ambiguous status in organizational practice, as it does in organizational theory. In practice, management appears to be of two minds about the exercise of leadership. Many jobs are so specified in content and method that within very broad limits differences among individuals become irrelevant, and acts of leadership are regarded as gratuitous at best, and at worst insubordinate." (Daniel Katz & Robert L Kahn, "The Social Psychology of Organizations", 1966)

"Most of our beliefs about complex organizations follow from one or the other of two distinct strategies. The closed-system strategy seeks certainty by incorporating only those variables positively associated with goal achievement and subjecting them to a monolithic control network. The open-system strategy shifts attention from goal achievement to survival and incorporates uncertainty by recognizing organizational interdependence with environment. A newer tradition enables us to conceive of the organization as an open system, indeterminate and faced with uncertainty, but subject to criteria of rationality and hence needing certainty." (James D Thompson, "Organizations in Action", 1967)

"'Structure follows strategy' is one of the fundamental insights we have acquired in the last twenty years. Without understanding the mission, the objectives, and the strategy of the enterprise, managers cannot be managed, organizations cannot be designed, managerial jobs cannot be made productive. [...] Strategy determines what the key activities are in a given business. And strategy requires knowing 'what our business is and what it should be'." (Peter F Drucker, "Management: Tasks, Responsibilities, Practices", 1973)

"We never like to admit to ourselves that we have made a mistake. Organizational structures tend to accentuate this source of failure of information." (Kenneth E Boulding, "Toward a General Social Science", 1974)

"A company is a multidimensional system capable of growth, expansion, and self-regulation. It is, therefore, not a thing but a set of interacting forces. Any theory of organization must be capable of reflecting a company's many facets, its dynamism, and its basic orderliness. When company organization is reviewed, or when reorganizing a company, it must be looked upon as a whole, as a total system." (Albert Low, "Zen and Creative Management", 1976)

"Five coordinating mechanisms seem to explain the fundamental ways in which organizations coordinate their work: mutual adjustment, direct supervision, standardization of work processes, standardization of work outputs, and standardization of worker skills." (Henry Mintzberg, "The Structuring of Organizations", 1979)

"We find that the manager, particularly at senior levels, is overburdened with work. With the increasing complexity of modern organizations and their problems, he is destined to become more so. He is driven to brevity, fragmentation, and superficiality in his tasks, yet he cannot easily delegate them because of the nature of his information. And he can do little to increase his available time or significantly enhance his power to manage. Furthermore, he is driven to focus on that which is current and tangible in his work, even though the complex problems facing many organizations call for reflection and a far-sighted perspective." (Henry Mintzberg, "The Structuring of Organizations", 1979)

"There are always 'class or prestige' gaps between various levels of management. There are also functional gaps between working units of the organization. If we superimpose the management gaps on top of the functional gaps, we find that companies are made up of small operational islands that refuse to communicate with one another for fear that giving up information may strengthen their opponents. The project manager’s responsibility is to get these islands to communicate cross-functionally toward common goals and objectives." (Harold Kerzner, "Project Management: A systems approach to planning, scheduling, and controlling", 1979)

"[Organizational] change is intervention, and intervention even with good intentions can lead to negative results in both the short and long run. For example, a change in structure in going from application of one theory to another might cause the unwanted resignation of a key executive, or the loss of an important customer. [...] the factor of change, acts as an overriding check against continual organizational alterations. It means that regardless of how well meant a change is, or how much logic dictates this change, its possible negative effects must be carefully weighed against the hoped-for benefits." (William A Cohen, "Principles of Technical Management", 1980)

"Knowledge-based organizations require managers to be problem-centered rather than territory-centered." (Dale E Zand, "Information, Organization, and Power", 1981)

"Organizations are social beings and their success depends on trust, subtlety and intimacy." (William Ouchi, "Theory Z", 1981)

"The models of management which individuals and organizations use come from a variety of sources. Sometimes the model comes from a theory. The theory may emerge from someone's thoughts about the desired characteristics of a manager, or about the characteristics of competent managers. Sometimes the model comes from a panel. A group of people, possibly in the job or at levels above the job within the organization, generates a model through discussion of what is needed to perform a management job competently." (Richard Boyatzis, "Competent Manager", 1982)

"Every company has two organizational structures: the formal one is written on the charts; the other is the everyday living relationship of the men and women in the organization." (Harold Geneen & Alvin Moscow, Managing, 1984)

"Any approach to the study of organizations is built on specific assumptions about the nature of organizations and how they are designed and function." (Richard L Daft & Karl E Weick, "Toward a model of organizations as interpretation systems", Academy of Management Review Vol 9 (2), 1984)

"[...] an examination of cultural issues at the organizational level is absolutely essential to a basic understanding of what goes on in organizations, how to run them, and how to improve them." (Edgar H Schein, "Organizational Culture and Leadership", 1985)

"Organizational cultures are created by leaders, and one of the decisive functions of leadership may well be the creation, the management, and - if and when that may become necessary - the destruction of culture." (Edgar Schein, "Organizational Culture and Leadership", 1985)

"Looking for differences between the more productive and less productive organizations, we found that the most striking difference is the number of people who are involved and feel responsibility for solving problems." (Michael McTague, 'Personnel Journal", 1986)

"Organizations are complex and paradoxical phenomena that can be understood in many different ways. Many of our taken-for-granted ideas about organizations are metaphorical, even though we may not recognize them as such. For example, we frequently talk about organizations as if they were machines designed to achieve predetermined goals and objectives, and which should operate smoothly and efficiently. And as a result of this kind of thinking, we often attempt to organize and manage them in a mechanistic way, forcing their human qualities into a background role. By using different metaphors to understand the complex and paradoxical character of organizational life, we are able to manage and design organizations in ways that we may not have thought possible before." (Gareth Morgan, "Images of Organization", 1986)

"Action often creates the orderly relations that originally were mere presumptions summarized in a cause map. Thus language trappings of organizations such as strategic plans are important components in the process of creating order. They hold events together long enough and tightly enough in people's heads so that they act in the belief that their actions will be influential and make sense." (Karl E Weick, "Organizational culture as a source of high reliability", 1987)

"All organizations engage in the three basic activities of strategy, tactics, and logistics. Strategy defines the job. Tactics does the job. Logistics provides the resources to get the job done - not only material resources, but also manpower, funds, and data." (Robert L Siegel, 1987)

"Organizations exist for only one purpose: to help people reach ends together that they could not achieve individually." (Robert H Waterman, "The Renewal Factor", 1987)

"[Successful organizations] comprehend uncertainty. They set direction, not detailed strategy. They are the best strategists precisely because they are suspicious of forecasts and open to surprise. They think strategic planning is great as long as no one takes the plans too seriously." (Robert H Waterman, "The Renewal Factor", 1987)

"[Well managed modern organizations] treat everyone as a source of creative input. What's most interesting is that they cannot be described as either democratically or autocratically managed. Their managers define the boundaries, and their people figure out the best way to do the job within those boundaries. The management style is an astonishing combination of direction and empowerment. They give up tight control in order to gain control over what counts: results." (Robert H Waterman, "The Renewal Factor", 1987)

"When they [managers] can't manage because of too much oversight, it permeates the entire organization." (Frank C Carlucci, "Frank Carlucci on Management in Government", 1987)

"Inertial pressures prevent most organizations from radically changing strategies and structures." (Michael T Hannan, "Organizational Ecology", 1989) 

"The importance of top management commitment to organizational change is so well accepted that it is almost cliché to repeat the fact. We would therefore expect managerial values to be just as important in this area as in others that require strategic direction and leadership" (Thomas A Kochan,"The Mutual Gains Enterprise", 1994) 

"Enterprise Engineering is not a single methodology, but a sophisticated synthesis of the most important and successful of today's change methods. 'Enterprise Engineering' first explains in detail all the critical disciplines (including continuous improvement, radical reinvention of business processes, enterprise redesign, and strategic visioning). It then illustrates how to custom-design the right combination of these change methods for your organization's specific needs." (James Martin, "The Great Transition, 1995)

"Now that knowledge is taking the place of capital as the driving force in organizations worldwide, it is all too easy to confuse data with knowledge and information technology with information." (Peter Drucker, "Managing in a Time of Great Change", 1995)

"Organizations are presumed to talk to themselves over and over to find out what they are thinking." (Karl E Weick, "Sensemaking in Organizations", 1995)

"Commonly, the threats to strategy are seen to emanate from outside a company because of changes in technology or the behavior of competitors. Although external changes can be the problem, the greater threat to strategy often comes from within. A sound strategy is undermined by a misguided view of competition, by organizational failures, and, especially, by the desire to grow." (Michael E Porter, "What is Strategy?", Harvard Business Review, 1996)

"Management is a set of processes that can keep a complicated system of people and technology running smoothly. The most important aspects of management include planning, budgeting, organizing, staffing, controlling, and problem solving. Leadership is a set of processes that creates organizations in the first place or adapts them to significantly changing circumstances. Leadership defines what the future should look like, aligns people with that vision, and inspires them to make it happen despite the obstacles." (John P Kotter, "Leading Change", 1996) 

"Strategy is creating fit among a company’s activities. The success of a strategy depends on doing many things well - not just a few - and integrating among them. If there is no fit among activities, there is no distinctive strategy and little sustainability. Management reverts to the simpler task of overseeing independent functions, and operational effectiveness determines an organization’s relative performance."  (Michael E Porter, "What is Strategy?", Harvard Business Review, 1996)

"There are several world view assumptions present in enterprise engineering. The first assumption is that the enterprise can be viewed as a complex system. This is necessary because systems in organizations are systems of organized complexity. Complexity is the result of the multiplicity and intricacy of man’s interaction with other components of the system. Secondly, the enterprise is to be viewed as a system of processes. These processes are engineered both individually and holistically. The final assumption is the use of engineering rigor in transforming the enterprise. The enterprise engineering paradigm views the enterprise as a complex system of processes that can be engineered to accomplish specific organizational objectives. In the Enterprise Engineering paradigm, the enterprise is viewed as a complex system of processes that can be engineered to accomplish specific organizational objectives." (Donald H Liles, "Enterprise modeling within an enterprise engineering framework", 1996)

"Good leaders make people feel that they're at the very heart of things, not at the periphery. Everyone feels that he or she makes a difference to the success of the organization. When that happens, people feel centered and that gives their work meaning." (Warren Bennis, "Managing People Is Like Herding Cats", 1999)

"This is what systems thinking is all about: the idea of building an organization in which each piece, and partial solution of the organization has the fit, alignment, and integrity with your overall organization as a system, and its outcome of serving the customer." (Stephen G Haines, "The Systems Thinking Approach to Strategic Planning and Management", 2000)

"True systems thinking, on the other hand, studies each problem as it relates to the organization’s objectives and interaction with its entire environment, looking at it as a whole within its universe. Taking your organization from a partial systems to a true systems state requires effective strategic management and backward thinking." (Stephen G Haines, "The Systems Thinking Approach to Strategic Planning and Management", 2000)

"Organizations are (1) social entities that (2) are goal-directed, (3) are designed as deliberately structured and coordinated activity systems, and (4) are linked to the external environment." (Richard Daft, "The Leadership Experience", 2002)

"The key element of an organization is not a building or a set of policies and procedures; organizations are made up of people and their relationships with one another. An organization exists when people interact with one another to perform essential functions that help attain goals." (Richard Daft, "The Leadership Experience" , 2002)

"Organizations are not systems but the ongoing patterning of interactions between people. Patterns of human interaction produce further patterns of interaction, not some thing outside of the interaction. We call this perspective complex responsive processes of relating." (Ralph Stacey, 2005)

"Today’s big companies do very little to enhance the productivity of their professionals. In fact, their vertically oriented organization structures, retrofitted with ad hoc and matrix overlays, nearly always make professional work more complex and inefficient." (Lowell L Bryan & Claudia Joyce, "The 21st century organization", 2005)

"An ecology provides the special formations needed by organizations. Ecologies are: loose, free, dynamic, adaptable, messy, and chaotic. Innovation does not arise through hierarchies. As a function of creativity, innovation requires trust, openness, and a spirit of experimentation - where random ideas and thoughts can collide for re-creation." (George Siemens, "Knowing Knowledge", 2006)

"Businesses are themselves a form of design. The design of a business encompasses its strategy, organizational structure, management processes, culture, and a host of other factors. Business designs evolve over time through a process of differentiation, selection, and amplification, with the market as the ultimate arbiter of fitness [...] the three-way coevolution of physical technologies, social technologies, and business designs [...] accounts for the patterns of change and growth we see in the economy." (Eric D Beinhocker, "The Origin of Wealth. Evolution, complexity, and the radical remaking of economics", 2006)

"Change pressures arise from different sectors of a system. At times it is mandated from the top of a hierarchy, other times it forms from participants at a grass-roots level. Some changes are absorbed by the organization without significant impact on, or alterations of, existing methods. In other cases, change takes root. It causes the formation of new methods (how things are done and what is possible) within the organization." (George Siemens, "Knowing Knowledge", 2006)

"Hierarchy adapts knowledge to the organization; a network adapts the organization to the knowledge." (George Siemens, "Knowing Knowledge", 2006)

"Synergy occurs when organizational parts interact to produce a joint effect that is greater than the sum of the parts acting alone. As a result the organization may attain a special advantage with respect to cost, market power, technology, or employee." (Richard L Daft, "The Leadership Experience" 4th Ed., 2008)

"Systems thinking is a mental discipline and framework for seeing patterns and interrelationships. It is important to see organizational systems as a whole because of their complexity. Complexity can overwhelm managers, undermining confidence. When leaders can see the structures that underlie complex situations, they can facilitate improvement. But doing that requires a focus on the big picture." (Richard L Daft, "The Leadership Experience", 2008)

"The butterfly effect demonstrates that complex dynamical systems are highly responsive and interconnected webs of feedback loops. It reminds us that we live in a highly interconnected world. Thus our actions within an organization can lead to a range of unpredicted responses and unexpected outcomes. This seriously calls into doubt the wisdom of believing that a major organizational change intervention will necessarily achieve its pre-planned and highly desired outcomes. Small changes in the social, technological, political, ecological or economic conditions can have major implications over time for organizations, communities, societies and even nations." (Elizabeth McMillan, "Complexity, Management and the Dynamics of Change: Challenges for practice", 2008)

"In a complex society, individuals, organizations, and states require a high degree of confidence - even if it is misplaced - in the short-term future and a reasonable degree of confidence about the longer term. In its absence they could not commit themselves to decisions, investments, and policies. Like nudging the frame of a pinball machine to influence the path of the ball, we cope with the dilemma of uncertainty by doing what we can to make our expectations of the future self-fulfilling. We seek to control the social and physical worlds not only to make them more predictable but to reduce the likelihood of disruptive and damaging shocks (e.g., floods, epidemics, stock market crashes, foreign attacks). Our fallback strategy is denial." (Richard N Lebow, "Forbidden Fruit: Counterfactuals and International Relations", 2010)

"Restructuring is a favorite tactic of antisocials who have reached a senior position in an organization. The chaos that results is an ideal smokescreen for dysfunctional leadership. Failure at the top goes unnoticed, while the process of restructuring creates the illusion of a strong, creative hand on the helm." (Manfred F R Kets de Vries, "The Leader on the Couch", 2011)

"When organizations are unable to make new strategies - when people evade the work of choosing among different paths in the future - then you get vague mom-and-apple-pie goals everyone can agree on. Such goals are direct evidence of leadership's insufficient will or political power to make or enforce hard choices." (Richard Rumelt, "Good Strategy Bad Strategy", 2011)

"An organization's strategy is simply its plan for success. It's nothing more than the collection of intentional decisions a company makes to give itself the best chance to thrive and differentiate from competitors." (Patrick Lencioni, "The Advamtage: Why Organizational Health Trumps Everything Else In Business", 2012)

"In the context of an organization, to have autonomy is to be empowered, not just feel empowered. […] But it does not mean being a lone wolf or being siloed or cut off from the rest of the organization." (Sriram Narayan, "Agile IT Organization Design: For Digital Transformation and Continuous Delivery", 2015)

"Some hierarchy is essential for the effective functioning of an organization. Eliminating hierarchy has the frequent side effect of slowing down decision making and diffusing accountability." (Sriram Narayan, "Agile IT Organization Design: For Digital Transformation and Continuous Delivery", 2015)

"Whatever way we organize, the unit of organization is a team, and any team can turn into a silo if it acts in an insular manner. Therefore, in a sense, we can’t eliminate silos but only try to design around their side effects." (Sriram Narayan, "Agile IT Organization Design: For Digital Transformation and Continuous Delivery", 2015)

"Professional organizations had believed that by hiring well qualified, technically capable people, quality control would take care of itself. [...] Managers rationalized that quality control lapses could not be helped and were simply another cost of doing business. Now 
wasn't the only perfectionist in the university business." (Garth Peterson)