| Database Management Series |
A Software Engineer and data professional's blog on Business Intelligence /Analytics, SQL Server & other DBMS, DIKW Management, Software Engineering/Programming, Project Management, Dynamics 365 & other ERP systems, respectively other IT related topics.
Pages
- 🏠Home
- 🗃️Definitions
- 🔢SQL Server
- 🎞️SQL Server: VoD
- 🏭Fabric
- 🎞️Fabric: VoD
- ⚡Power BI
- 🎞️Power BI: VoD
- 📚Data
- 📚Engineering
- 📚Management
- 📚SQL Server
- 🎞️D365: VoD
- 📚Systems Thinking
- ✂...Quotes
- 🧾D365: GL
- 💸D365: AP
- 💰D365: AR
- 🏠D365: FA
- 👥D365: HR
- ⛓️D365: SCM
- 🔤Acronyms
- 🪢Experts
- 🔠Dataviz & BI
- 🔠D365
- 🔠Fabric
- 🔠Engineering
- 🔠Management
- 🔡Glossary
- 🌐Resources
- 🏺Dataviz
- 🗺️Social
- 📅Events
- ℹ️ About
01 May 2019
Database Management: Version Management (Part I: SQL Server Feature Bloat)
29 April 2019
💼Project Management: Planning Correctly Misunderstood - Part I
There are situations in which it’s better to be spontaneous and go with the flow. Managing a project isn’t one of these situations. As Lakein’s Law formulates it succinctly: "failing to plan is planning to fail", or paraphrasing Eisenhower (1) and Clausewitz (2) - plans are useless as no plan ever survived contact with the enemy (reality), but planning is indispensable - as a plan increases awareness about project’s scope, actions, challenges, risks and opportunities, and allows devising the tactics and logistics needed to reach the set goals. Even if the plan doesn’t reflect anymore the reality, it can still be adapted to fit the new requirements. The more planning experience one has the more natural it becomes to close the gap between the initial plan and reality, and of adapting the plan as needed.
There’s an important difference between doing something because one is forced to do it and doing it because one sees and understands the value of planning. There's the tendency to plan for the sake of planning, because there's the compel to do it. Besides the fact that it documents the what, when, why and who, and that is used as a basis for action, the plan must reflect project’s current status and the activities planed for the next reporting cycle. As soon a plan is not able to reflect these aspects it becomes thus in time unusable.
The enemy of a good plan can prove to be the dream of a perfect plan (3). Some may think that the holy grail of planning is the perfect plan, that the project can’t start until all the activities were listed to the lowest detail and the effort thoroughly assigned. Few plans actually survive the contact with the reality and there can be lot of energy lost by working on the perfect plan.
Another similar behavior, rooted mainly in the methodologies used, is that of not allowing a plan to be changed for a part or whole duration of the project. Publilius Syrus recognized more than two millennia ago that a plan that admits no modification is a bad plan (4) per se. Methodologies and practices that don’t allow a flexible way of changing the plan make no service to projects. Often changes need to occur immediately and not at an ideal point in time, when maybe the effect is lost.
Modern Project Management tools allow building the dependencies between the various activities and it’s inevitable that a change in one place will cause a chain reaction and lead to a contraction or dilatation of the plan, and this can happen with each planning iteration. In extremis the end date will alternate as the lines of a seismograph during an earthquake. It’s natural for this to happen in projects in a first phase, however it’s in Project Manager’s attribution to mitigate such variations.
The project plan is a reflection of the project and how it’s managed, therefore, one needs to give it the proper focus, how often and how detailed required.
Referenced quotes:
(1) "In preparing for battle I have always found that plans are useless, but planning is indispensable." (Eisenhower quoted by Nixon)
(2) "No plan ever survived contact with the enemy. " (Carl von Clausewitz)
(3) "The enemy of a good plan is the dream of a perfect plan." (Carl von Clausewitz)
(4) "It's a bad plan that admits of no modification." (Publilius Syrus)
🗄️Data Management: Data Integration (Part I: From Disintegration to Integration)
![]() |
| Data Management Series |
24 April 2019
💼Project Management: Project Execution (Part V: The Butterflies of Project Management)
22 April 2019
💼Project Management: Tools (Part I: The Choice of Tools in Project Management)
It’s sometimes admirable people and even organizations’ stubbornness in using the same tools in totally different scenarios, expecting though the same results, as well in similar scenarios expecting different results. It’s true, Mathematics has proven that the same techniques can be used successfully in different areas, however a mathematician’s universe and models are idealistically fractionalized to a certain degree from reality, full of simplified patterns and never-ending approximations. In contrast, the universe of Software Development and Project Management has a texture of complex patterns with multiple levels of dependencies and constraints, constraints highly sensitive to the initial conditions.
Project Management has managed to successfully derive tools like methodologies, processes, procedures, best practices and guidelines to address the realities of projects, however their use in praxis seems to be quite challenging. Probably, the challenge resides in stubbornness of not adapting the tools to the difficulties and tasks met. Even if the same phases and multiple similarities seems to exist, the process of building a house or other tangible artefact is quite different than the approaches used in development and implementation of software.
Software projects have high variability and are often explorative in nature. The end-product looks totally different than the initial scaffold. The technologies used come with opportunities and limitations that are difficult to predict in the planning phase. What on paper seems to work often doesn’t work in praxis as the devil lies typically in details. The challenges and limitations vary between industries, businesses and even projects within the same organization.
21 April 2019
💼Project Management: Project Planning (Part II: Planning Correctly Misunderstood II)
The misunderstandings derive maybe also from the fact that each methodology introduces its own approach to planning. PMI as traditional approach talks about baseline planning with respect to scope schedule and costs, about management plans, which besides the theme covered in the baseline, focus also on quality, human resources, risks, communication and procurement, and separate plans can be developed for requirements, change and configuration management, respectively process improvement. To them one can consider also action and contingency planning.
In Prince2 the product-based planning is done at three levels – at project, stage, respectively team level – while separate plans are done for exceptions in case of deviations from any of these plans; in addition there are plans for communication, quality and risk management. Scrum uses an agile approach looking at the product and sprint backlog, the progress being reviewed in stand-up meetings with the help of a burn-down chart. There are also other favors of planning like rapid application planning considered in Extreme Programming (XP), with an open, elastic and undeterministic approach. In Lean planning the focus is on maximizing the value while minimizing the waste, this being done by focusing on the value stream, the complete list of activities involved in delivering the end-product, value stream's flow being mapped with the help of visualization techniques such as Kanban, flowcharts or spaghetti diagrams.
With so many types of planning nothing can go wrong, isn’t it? However, just imagine customers' confusion when dealing with a change of methodology, especially when the concepts sound fuzzy and cryptic! Unfortunately, also the programmers and consultants seem to be bewildered by the various approaches and the philosophies supporting the methodologies used, their insecurity bringing no service for the project and customers’ peace of mind. A military strategist will more likely look puzzled at the whole unnecessary plethora of techniques. On the field an army has to act with the utmost concentration and speed, to which add principles like directedness, maneuver, unity, economy of effort, collaboration, flexibility, simplicity and sustainability. It’s what Project Management fails to deliver.
Similarly to projects, the plan made before the battle seldom matches the reality in the field. Planning is an exercise needed to divide the strategy in steps, echelon and prioritize them, evaluate the needed resources and coordinate them, understand the possible outcomes and risks, evaluate solutions and devise actions for them. With a good training, planning and coordination, each combatant knows his role in the battle, has a rough idea about difficulties, targets and possible ways to achieve them; while a good combatant knows always the next action. At the same time, the leader must have visibility over fight’s unfold, know the situation in the field and how much it diverged from the initial plan, thus when the variation is considerable he must change the plan by changing the priorities and make better use the resources available.
Even if there are multiple differences between the two battlefields, the projects follow the same patterns of engagement at different scales. Probably, Project Managers can learn quite of a deal by studying the classical combat strategists, and hopefully the management of projects would be more effective and efficient if the imperatives of planning, respectively management, were better understood and addressed.
#️⃣Software Engineering: Programming (Part VIII: Pair Programming)
![]() |
| Software Engineering Series |
19 April 2019
🌡Performance Management: Mastery (Part I: The Need for Perfection vs. Excellence)
A recurring theme occurring in various contexts over the years seemed to be corroborated with the need for perfection, need going sometimes in extremis beyond common sense. The simplest theory attempting to explain at least some of these situations is that people tend to confuse excellence with perfection, from this confusion deriving false beliefs, false expectations and unhealthy behavior.
Beyond the fact that each individual has an illusory image of what perfection is about, perfection is in certain situations a limiting force rooted in the idealistic way of looking at life. Primarily, perfection denotes that we will never be good enough to reach it as we are striving to something that doesn’t exist. From this appears the external and internal criticism, criticism that instead of helping us to build something it drains out our energy to the extent that it destroys all we have built over the years with a considerable effort. Secondarily, on the long run, perfection has the tendency to steal our inner peace and balance, letting fear take over – the fear of not making mistakes, of losing the acceptance and trust of the others. It focuses on our faults, errors and failures instead of driving us to our goals. In extremis it relieves the worst in people, actors and spectators altogether.
In its proximate semantics though at diametral side through its implications, excellence focuses on our goals, on the aspiration of aiming higher without implying a limit to it. It’s a shift of attention from failure to possibilities, on what matters, on reaching our potential, on acknowledging the long way covered. It allows us building upon former successes and failures. Excellence is what we need to aim at in personal and professional life. Will Durant explaining Aristotle said that: “We are what we repeatedly do. Excellence, then, is not an act, but a habit.”
People who attempt giving 100% of their best to achieve a (positive) goal are to admire, however the proximity of 100% is only occasionally achievable, hopefully when needed the most. 100% is another illusory limit we force upon ourselves as it’s correlated to the degree of achievement, completeness or quality an artefact or result can ideally have. We rightly define quality as the degree to which something is fit for purpose. Again, a moving target that needs to be made explicit before we attempt to reach it otherwise quality envisions perfection rather than excellence and effort is wasted.
Considering the volume of effort needed to achieve a goal, Pareto’s principles (aka the 80/20 rule) seems to explain the best its underlying forces. The rule states that roughly 80% of the effects come from 20% of the causes. A corollary is that we can achieve 80% of a goal with 20% of the effort needed altogether to achieve it fully. This means that to achieve the remaining 20% toward the goal we need to put four times more of the effort already spent. This rule seems to govern the elaboration of concepts, designs and other types of documents, and I suppose it can be easily extended to other activities like writing code, cleaning data, improving performance, etc.
Given the complexity, urgency and dependencies of the tasks or goals before us probably it's beneficial sometimes to focus first on the 80% of their extent, so we can make progress, and focus on the remaining 20% if needed, when needed. This concurrent approach can allow us making progress faster in incremental steps. Also, in time, through excellence, we can bridge the gap between the two numbers as is needed less time and effort in the process.
18 April 2019
🪧Meta-Blogging: Mea Culpa (Part I: Changing the Status Quo)
During the past years I started multiple posts on various programming-related topics though I seldom managed to bring something close to a publishable form. The main reason seems to be the lack of time needed to put an idea into words, to look at it from different perspectives in form of a logical meaningful unit and, last but not the least, make it count. This is accentuated by the fact that each idea pulls another, and often there are so many things to say that it’s hard to find a delimitation between what to be included and what to be left out. In extremis one feels that something is missing.
Often, it's required a certain amount of research needed to validate or support the facts. The knowledge about SQL Server and other DBMS is relative – it can be only relative as long their internals are known only to a certain degree. The relativity is found also in the area of applicability, the usage of a solution over another lying in details. Readers want solid facts while all one can give is a dry “it depends”…
Unfortunately, for a blogger not found close to the source of knowledge, the content posted tends to be third or fourth-hand knowledge and, in one form or the other, just duplication of information. As long content isn’t copied and there’s some personal touch the duplication is not necessarily a bad thing. Duplication makes knowledge more likely to be found as the content is indexed by search engines, however it becomes more difficult to stand in the crowd. To bring something new one must to put existing knowledge into new contexts, to be creative, and this takes time as well.
Without access to a pool of readers and of knowledge for a lone blogger it’s hard to succeed, giving up being just a few posts or a few years away. Of course, life tends to take over. It’s also in human nature to be enthusiastic about an idea and renounce shortly with the first difficulties met. On the other side, often it’s hard to keep or to find the needed motivation, especially when there is little support coming from the blogging platforms, tools creators or content publishers. Not being able to monetize one’s effort makes blogging more of a hobby.
With small exceptions, the investments made in blogging tools are below expectations. It’s frustrating when the tools or the integration between them stopped working and there’s no simple way to overcome this. Some aspects changed with time, however blogging seems to lose in contrast with other forms of media content.
Despite the lack of time and other difficulties I want to write and share my thoughts, my experience, make the time invested in learning and solving problems count. Blogging is also a way to externalize the implicit knowledge, of sharing, of questioning some of the ideas and practices, and ultimately of getting feedback. In this resides the personal value of blogging!
In the fight with time and words, I found myself forced to limit the length of the posts on some random nontechnical topics to 600 words. This number is rooted in the university years, representing the proximate limit of a written assignment to include an acceptable quality and coverage, and involve a bearable amount of effort. 600 is not a perfect number as its leading digit though, for the time being will do.
The challenge is to find a context to express my thoughts and experience without being too boring, without skimming through ideas. Without carrying great expectations, it’s an attempt to change the status quo!
12 March 2019
🧭Business Intelligence: Enterprise Reporting (Part XII: Reports’ Lifecycle)
Introduction
A report’s lifecycle is the sequence of stages through which a report goes during the timespan of its ownership. The main stages resume mainly to report’s definition, development, testing and deployment, however a report’s life occurs within the context of IT processes like Change, Incident/Problem, Access, Availability, Information Security and Knowledge Management. To them can add up Data Management processes like Data Governance, Data Quality and Metadata Management. Therefore, the extended reports’ lifecycle could take the following form:The processes can be easily tailored to an organization’s needs, even if it may take several attempts until the best mix is found. The activities introduced by the supporting processes don’t necessarily change the way reports are developed as long the processes integrate smoothing in report’s authoring.
Definition Phase
The lifecycle of a report starts with a series of steps that lead to report’s definition and the requirements associated with it:The starting point is the identification of a need for data. It can be a business question that needs to be answered, a decision that needs to be made, data needed to keep an operational, tactical or strategical objective under control, and so on. Such business situations can be referred simple as (business) problems.
Problem definition
Problem definition (statement) is the process by which a business issue or need is clearly and concisely stated. This step might seem trivial and implied, however in praxis correlated to it lies the most important volume of overwork.The dictum “a problem well stated is a problem half-solved” applies as well in BI field. Unfortunately, there are cases in which the users want something else than stated or they leave important details out. Sometimes the users aren’t sure what they need/want, and it comes in developer’s attributions to help clarify the problem and put it within a context.
There are cases in which the users just request a report without specifying the problem they need to solve. This might do when the user has a good understanding of the data and the problem, however this approach does not always work. Personally, I find it useful to define for each report also the underneath problem. I see it as a “win-win” situation in which the user invests some knowledge into the developer and thus the developer will better understand the business, while in time he can provide better help. A thorough understanding of the business and knowledge of the users and their needs can help minimize the volume of overwork involved in reports’ development.
Requirements definition
Requirements definition is the process by which functional and non-functional expectations, targets and specifications are elicited and documented.Functional requirements specify what the report must do - how the report is structured or formatted, how data need to be visualized or navigated, to what file formats need to be exported, on whether needs to be printed, how the data needs to be grouped, in which order, in what currency/language needs to be displayed, what data sources need to be used, etc. The functional requirements are typically listed in the use case and test script.
Non-functional requirements refer to requirements related to report’s accessibility, availability, performance, compliance, documentation, quality, maintainability, security or testability.
The degree to which a requirement can be fulfilled depends entirely on the reporting platform. It can be differentiated between soft and hard constraints. Soft constraints can be overcome by adding more processing power, memory or other types of resources, while hard constraints can’t be easily or at all overcome. Of course, not all requirements are equally important. Important not fulfilled requirements can make a report unusable and, in extremis, can lead to choosing one reporting platform over another.
The requirements can be elicited by a developer, an analyst/consultant or defined by the business itself. Organizations can simplify the process by defining a set of guidelines and standards that need to be considered in reports’ definition. Normally, is enough to reference the document(s) where the guidelines and standards are found. In contrast to other software artifacts, the requirements for reports can be gather in a simplified version of a document. Quite often a checklist can help identify these requirements upfront with a minimum of overhead.
Report definition
Report definition is the process by which report’s content, logic and layout are explicitly defined - what attributes are needed for output and from what source, what static/dynamic parameters are needed, how the data need to be displayed/formatted, what formulas, aggregations or ordering apply.A report’s definition can be anything between a simple statement summarizing what the report is about and complex structures (mainly in form of a mapping) reflecting in detail each attribute, constraint, formula, grouping or sorting.
A good definition should allow a developer to create the report as needed by the users, eventually with minimal deviations implied by user’s understanding. The holy grail in report’s definition is finding a structure flexible enough to cover all the aspects of a report. Even if some structures allow such flexibility, sometimes it’s almost impossible not provide additional descriptions in textual forms. The less insight the developer has into the business, the more textual descriptions and visuals are needed to be included to support the knowledge gap.
GAP Analysis
GAP Analysis is the iterative process by which the current state of a software artifact or situation is compared with the potential or desired state. It became an integrant tool from professionals’ thinking to the extent its role as separate process is quite often ignored. In the context of reporting authoring it can be used when comparing the requirements against the current infrastructure and the data available, as well while comparing the developed report against the requirements.It can happen that the technical and data constraints don’t allow building the report as needed by the users. The differences need to be mitigated and eventually the requirements need to be changed to accommodate the reality. In extremis must be considered whether the report still make sense in the light of the modified requirements.
Solution formulation
Solution formulation is the process by which a formal (technical) solution is defined for the given requirements. It’s a conceptualization (aka concept) of the requirements, and in many cases it’s just a short description by which means the report will be build and what data sources will be used. In more complex cases it can include details about the changes needed in the infrastructure to support the report (e.g. creation/extensions of tables and other database objects, ETL jobs, components, etc.), about the data that need to be collected, etc.Of course, the conceptualization must be considered together with report’s definition. In fact, report’s definition can be considered as part of the conceptualization. A conceptualization can cover multiple reports, as well two or more different solutions can be provided for different sets of reports. The infrastructure can make a concept futile, either when there is a single reporting platform, or when clear rules are in place.
Prototyping
Prototyping is the iterative process of building a simplified version of the report for demonstration and evaluation purposes, so that users can better define the requirements or to prove the concept. The prototype is a preliminary version that can be refined successively until user’s requirements have a final form. It can take the form of a mock-up query to verify report’s technical and logical feasibility, and/or an Excel layout to depict how the report will look like. Prototypes can facilitate the communication between the parties involved and can be considered as part of the requirements.A prototype might be needed 1 from 5 cases or so, however this number depends also on the number of queries available or of the knowledge of the source and business processes. Because a prototype can involve additional work, it’s important to identify those cases in which a prototype makes sense and keep the effort to a minimum, especially when an approval is involved in the process. Therefore, one should consider the most important characteristics that need to be proved (e.g. if the data can be aggregated, matched, displayed at the requested level of detail, or in the requested format).
With the help of self-service tools, the business has the capabilities to play with the data and find answers by itself, being able thus to create a prototyped version of the report. Once the report met business needs it can be standardized so it can be used organization-wide. It’s recommended to standardize the reports that are used as part of organization’s processes, otherwise self-service can become a bottleneck for the organization.
Change Management
Change Management is the process of ensuring that the changes performed to a system, in this case a BI tool or the whole BI infrastructure, are performed with minimal disruption for the business and that risks are kept under control. Changes can be requested via standard requests or change requests. A standard request (SR) is a pre-approved change that involves low risks, is relatively common and follows a predefined procedure. In contrast to SRs, a change request (CR) requires the authorization of a board, e.g. the Change Advisory Board (CAB), it often involves risks, an investment and the approach is not that common.Both are hard-copy or electronic templates that allow to capture information about the changes and allow to document the change and track its status. They include typically the problem definition together with users’ requirements, report definition and the formulation of the solution. What differentiates them thus is the approval process that can be sometimes time-consuming, and the volume of formalism needed to manage the requests (e.g. tracking status, writing status reports, handling risks, etc.).
Unless infrastructural changes are necessary, the risks involved with the creation of reports are relatively small, especially when the reports are developed in-house. Reports developed by vendors involve more risks and imply investments that in a form or other need to be approved. Considering the particularities of the two approaches, personally I think that reports that can be developed with internal resources should be done via SRs, while reports developed externally should be done via CRs. Even if this categorization has the potential of creating some confusion, the use of SRs allows reducing the volume of effort necessary to manage the requests. I suppose there can be found solutions to request external changes via SRs as well (e.g. by using contingents and a set of well-defined rules).
06 February 2019
🤝Governance: COBIT (Definitions)
"An IT governance framework and supporting toolset that allows managers to bridge the gap between control requirements, technical issues, and business risks. COBIT enables clear policy development and good practice for IT control throughout organizations. COBIT is managed by the IT Governance Institute and the Information Systems Audit and Control Foundation® (ISACF)." (Tilak Mitra et al, "SOA Governance", 2008)
"COBIT is a set of standards from the IT Governance Institute relating to IT Governance. It defines a set of governance control objectives to help guide the IT organization in making appropriate decisions for each domain." (Martin Oberhofer et al, "Enterprise Master Data Management", 2008)
"An internationally accepted IT governance and control framework that aligns IT business objectives, delivering value and managing associated risks." (Linda Volonino & Efraim Turban, "Information Technology for Management" 8th Ed., 2011)
"An IT framework with a focus on governance and managing technical and business risks." (Marcia Kaufman et al, "Big Data For Dummies", 2013)
"A management framework used for IT governance. COBIT 5 is based on five principles and provides organizations with a set of good practices they can apply to IT management and IT governance." (Darril Gibson, "Effective Help Desk Specialist Skills", 2014)
"A process-based information technology governance framework that represents a consensus of experts worldwide. It was codeveloped by the IT Governance Institute and ISACA." (Robert F Smallwood, "Information Governance: Concepts, Strategies, and Best Practices", 2014)
"A framework that provides best practices for IT governance and control." (Weiss, "Auditing IT Infrastructures for Compliance" 2nd Ed., 2015)
"Provides guidance and best practice for the management of IT processes" (ITIL)
30 January 2019
🤝Governance: Compliance (Definitions)
"(1) Conforming or acquiescing to requirements from a third party. (2) A subset of data retention policies and procedures that must adhere to more rigid and rigorous conditions." (David G Hill, "Data Protection: Governance, Risk Management, and Compliance", 2009)
"The successful fulfillment of regulations, usually set by a financial institution (for borrowing purposes) or industry standards." (Annetta Cortez & Bob Yehling, "The Complete Idiot's Guide® To Risk Management", 2010)
"The process of conforming, completing, performing, or adapting actions to meet the rules, demands, or wishes of another party. Commonly used when discussing conformance to external government or industry regulations." (Craig S Mullins, "Database Administration: The Complete Guide to DBA Practices and Procedures 2nd Ed", 2012)
"The ability to operate in the way defined by a regulation. Many organizations are introduced to governance concepts as they begin the process of complying with business regulations, such as Sarbanes|Oxley or Basel II. These regulations are enforced by audits that determine whether business decisions were made by the appropriate staff according to appropriate policies. To pass these audits, organizations must document their decision rights, policies, and records, specifically that each of the decisions was in fact made by the appropriate person according to policy." (Paul C Dinsmore et al, "Enterprise Project Governance", 2012)
"The process of conforming, completing, performing, or adapting actions to meet the rules, demands, or wishes of another party. Commonly used when discussing conformance to external government or industry regulations." (Craig S Mullins, "Database Administration", 2012)
"A general concept of conforming to a rule, standard, law, or requirement such that the assessment of compliance results in a binomial result stated as 'compliant' or 'noncompliant'." (For Dummies, "PMP Certification All-in-One For Dummies, 2nd Ed.", 2013)
"Business rules enforced by legislation or some other governing body" (Daniel Linstedt & W H Inmon, "Data Architecture: A Primer for the Data Scientist", 2014)
"Compliance refers to a strategy and a set of activities and artifacts that allow teams to apply Lean-Agile development methods to build systems that have the highest possible quality, while simultaneously assuring they meet any regulatory, industry, or other relevant standards." (Dean Leffingwell, "SAFe 4.5 Reference Guide: Scaled Agile Framework for Lean Enterprises 2nd Ed", 2018)
"Ensuring that a standard or set of guidelines is followed, or that proper, consistent accounting or other practices are being employed." (ITIL)
"The capability of the software product to adhere to standards, conventions or regulations in laws and similar prescriptions." [ISO 9126]
28 January 2019
🤝Governance: Standard (Definitions)
24 January 2019
🤝Governance: Authority (Definitions)
[formal authority:] "Explicit power granted to meet an explicit set of service expectations, such as those in job descriptions or legislative mandates." (Alexander Grashow et al, "The Practice of Adaptive Leadership", 2009)
"Formal or informal power within a system, entrusted by one party to another in exchange for a service. The basic services, or social functions, provided by authorities are: (1) direction; (2) protection; and (3) order." (Alexander Grashow et al, "The Practice of Adaptive Leadership", 2009)
[informal authority:] "Power granted implicitly to meet a set of service expectations, such as representing cultural norms like civility or being given moral authority to champion the aspirations of a movement." (Alexander Grashow et al, "The Practice of Adaptive Leadership", 2009)
[Decision-making authority:] "Refers to the decisions that agents are authorized to make on behalf of principals. (585)" (Leslie G Eldenburg & Susan K Wolcott, "Cost Management 2nd Ed", 2011)
"The right to apply project resources, expend funds, make decisions, or give approvals." (Cynthia Stackpole, "PMP Certification All-in-One For Dummies", 2011)
"The explicit or implicit delegation of power or responsibility for a particular activity." (Sally-Anne Pitt, "Internal Audit Quality", 2014)
"The power vested in a person by virtue of her role to expend resources: financial, material, technical, and human." (Fred MacKenzie, "7 Paths to Managerial Leadership", 2016)
"The ability of a role incumbent to apply resources to a task without reference to another person." (Catherine Burke et al, "Systems Leadership" 2nd Ed., 2018)
"‘The right, given by constitution, law, role description or mutual agreement for one person to require another person to act in a prescribed way (specified in the document or agreement). The likelihood of exercising authority effectively will usually depend upon good Social Process Skills’. The acceptance of the exercise of authority within a work organisation is a function of the contract of employment. Is it essential that there is a clear understanding of the difference between authority and power and that authority is not a one-way process. In a correctly functioning organisation, for example, a manager has the authority to assign tasks to a direct report and the direct report has the authority to require a task performance review by the manager." (Catherine Burke et al, "Systems Leadership" 2nd Ed., 2018)
"power to direct and exact performance from others. It includes the right to prescribe the means and methods by which work will be done. However, the authority to direct is only as good as one individual’s willingness to accept direction from another. Moreover, with authority comes responsibility and accountability." (All Business, "Dictionary of Accounting Terms")
"(1) power
over others by sanctioned personnel within an organization. Managers have the
authority to hire and fire personnel in an organization. With authority comes
responsibility for one’s actions. (2) a government corporation or agency that
administers a public enterprise." (All Business, "Dictionary of Business Terms")